Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Mapltree Logistic Park (Phase 4) - Reecons Engineering

PROJECT DETAIL

Mapltree Logistic Park (Phase 4)

PROJECT OVERVIEW

Location: VSIP II Binh Duong, Vietnam
Scale: 58,800 sqm.
Client: Mapletree Vietnam Management Consultancy Co., Ltd.
Scope of Services: Full MEP Installation
Construction period: 06 months

DESCRIPTION

Reecons installed M&E systems such as main power, lightning protection, CCTV and water supply, plumping systems to meet the high standard requirement of the Client such as NFPA and UL/FM, all by respecting the aesthetic aspect of the project.

As a result, Reecons claims a complete success on this project with:

  • 120,000 safe hours
  • Catch up on schedule, more than 1 month in advance
  • High technical and aesthetics standards, approved by the client.

OTHER PROJECTS

Vinagame Data Center
BOSCH Vietnam Factory
OFH – Office Haus
French Consultate General Ho Chi Minh City
Boustead Ready Built Factories (Phase 1)
iLD Vietnam Coffee Plant
Nestle Binh An Factory
USG Boral Factory (Phase 2)
Universal Alloy Corporation Vietnam Factory
XP Power Vietnam Factory (Phase 2)

Trusted by international firms and partners 

Scroll to Top