PROJECT DETAIL

Boustead Ready Built Factories (Phase 1)

PROJECT OVERVIEW

Location: Dong Nai, Vietnam
Scale: 50,000 sqm.
Client: Boustead Project Company Limited
Scope of Services: Full MEP Installation
Construction period: 06 months

DESCRIPTION

According to the need to develop rental factories, the Boustead investor has invested in building a system of factories for rent with 05 factories B1, B2, B3, B4, and B5 over 6Ha (phase 1). Reecons was selected as the D&B contractor for the MEP package, complying with the strict safety requirements and delivered the project on time.

The following systems were installed: 22kV medium voltage system, 4 sub-stations 1500kVA and 1 sub-station 1000kVA, Switchgears (DS, Re-closer, RMU), electrical system from MSB to DB distribution, lighting sources, pumping stations, Fire Protection system (Fire Alarm & Fire Fighting system), CCTV, ELV (Data & Telecom), plumbing and sanitary systems. All our systems operate stably on the basis of our design.

OTHER PROJECTS

Backer Heating Vietnam Factory
XP Power Vietnam Factory (Phase 2)
Mapltree Logistic Park (Phase 4)
Anova Feedmill Factory
Emivest Feedmill First Factory in Vietnam
Hayat Kimya first production line in Vietnam
Satra Eximland Building
Iron Mountain Warehouse
ONSEMI Factory Renovation
Makino Technical Centre

Trusted by international firms and partners 

Scroll to Top