BOSCH VIETNAM FACTORY

Project Overview

Location:               Dong Nai, Vietnam

Client:                    Bosch Vietnam Company Limited

Scale:                     7,800 sqm

Scope of work:      Electrical System Installation

MEP Installation:   6 months


 

Project Information

Bosch’s existing factory in Dong Nai went for an upgrade of its facilities for 3 of their assembly cabins. Reecons was awarded to execute the Electrical system following the strict internal safety regulation of Bosch, while ensuring on-time delivery despite a very tight given schedule.

With our strength and experience on international hi-tech projects, Reecons handled successfully this valuable project with the following installed systems: additional HV switchgear imported from Germany to be connected to the existing and in-operation HV switchgear, integrated transformer station, bus-way system to the MSB, power cable and ladder, high bay lighting, and instrument and control systems.


 