Since 2017, as part of our effort to grow with multi-disciplined services, Reecons has trained and empowered our Engineering Department to deliver design and value engineering through building information modeling (BIM). With the proficient use of BIM by the BIM operation team, we are able to detect, diagnose, and fix constructability problems before construction starts.
Photos: BIM Modelling for Chiller Technical Room.
It results in many benefits brought to your project life cycle including:
- At the construction stage, the project timeline is well managed since BIM allows foreseeing clashes and avoiding problems at the design stage.
- During operation: possible maintenance & audit works since BIM provides access to visual facility data and makes it easier to implement new equipment and systems in the future.
- 3D visualizations and space-use simulations allow different alternatives to agree on a common vision early on. BIM helps to minimize time-consuming and expensive changes once the construction is underway.
Photos: After construction for 10 air-cooled chillers with heat recovery at a capacity of 1,215kw / chiller.