Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Aeon Mall Binh Tan - Reecons Engineering

PROJECT DETAIL

Aeon Mall Binh Tan

PROJECT OVERVIEW

Location: Ho Chi Minh City, Vietnam
Scale: 1,200 sqm.
Client: AEON Group
Scope of Services: M&E Fit-out works in shopping mall
Construction period: 2 months

DESCRIPTION

The entire fit-out works cover power supply connection to the stores taken from the main power supply of the building, lighting system, socket outlet, ELV system including data, telephone, speaker, fire alarm and air conditioning system with air ducts, return & supply air grill.

In particular, the plumping system was designed & installed by Reecons with safety, high quality of finishing, and advance on the schedule for the opening date.

OTHER PROJECTS

GREIF Flexible Vietnam Factory
French Consultate General Ho Chi Minh City
Aeon Mall Binh Tan
Riken Technos Vietnam Factory
Private Luxury Villa
Onsemi Factory Renovation
Iron Mountain Warehouse
iLD Vietnam Coffee Plant
USG Boral Factory (Phase 2)
Universal Alloy Corporation Vietnam Factory

Trusted by international firms and partners 

Scroll to Top