Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
OFH – Office Haus - Reecons Engineering

PROJECT DETAIL

OFH – Office Haus

PROJECT OVERVIEW

Location: Celadon Tan Phu, Vietnam
Scale: Gamuda Land 22,000 sqm.
Client: Gamuda Land

DESCRIPTION

This high-end office building is certified by the U.S. Green Building Council (USGBC).

The building has a basement, 7 floors. The air conditioning system uses VRV air conditioning system. The fresh air supply system is designed in accordance with Ashrae standards and is supplied by 4 PAU (Frimary
Air Handling Units). The air processors with a heat recovery unit uses the exhaust air temperature to pre-cool the fresh air, then enters the PAU air processor and is blown into the working space on the floors. The building is equipped with solar roof top solar energy system with a capacity of 150KW serves the loads.

Being one of the most high-tech office building, all the M&E systems, elevators, parking, access control are managed and operated by the building management system (BMS).

OTHER PROJECTS

Anova Feedmill Factory
Iron Mountain Warehouse
Hayat Kimya first production line in Vietnam
Backer Heating Vietnam Factory
Bac Lieu Power Company
Private Luxury Villa
GREIF Flexible Vietnam Factory
May Delta Galil Vietnam
Nestle Binh An Factory
XP Power Vietnam Factory (Phase 2)

Trusted by international firms and partners 

Scroll to Top