Aldo’s luxury retail store is located in the Saigon Center and included a variety of decorative lighting inside the box and cabinets, has been well installed by Reecons’ workmanship and technical team.
All the flexible air ducts were connected to the existing air conditioning system of the Saigon Center building. The project was delivered 10 days in advance compared to the contract schedule.