Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
GREIF Flexible Vietnam Factory - Reecons Engineering

PROJECT DETAIL

GREIF Flexible Vietnam Factory

PROJECT OVERVIEW

Location: Dong Nai, Vietnam
Scale: 4,500 sqm.
Client: Greif Flexible Vietnam
Scope of Services: Design & Build – C&S and MEP construction
Construction period: 06 months

DESCRIPTION

Greif, Inc. – a global leader in industrial packaging products and services, has invested in a new factory in Giang Dien IP, Dong Nai Province. Reecons was appointed as the Design & Build contractor to deliver high-quality standard MEP services, high tech installations while still
ensuring a tight budget, by providing cost-effective MEP solutions, resulting in a reduction of 17% investment cost compared to market baseline.

OTHER PROJECTS

Mercedes-benz Tan Binh Showroom
iLD Vietnam Coffee Plant
OFH – Office Haus
Vinagame Data Center
Hayat Kimya first production line in Vietnam
Backer Heating Vietnam Factory
BOSCH Vietnam Factory
USG Boral Factory (Phase 2)
Rebisco Biscuit Vietnam Factory
Denis Canning Vietnam Factory

Trusted by international firms and partners 

Scroll to Top