Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Backer Heating Vietnam Factory - Reecons Engineering

PROJECT DETAIL

Backer Heating Vietnam Factory

PROJECT OVERVIEW

Location: Kizuna I, Long An, Vietnam
Scale: 3,500 sqm.
Client: Backer Heating Technologies Vietnam

DESCRIPTION

In 2018, NIBE Group – a Climate Solutions, Element and Stoves from Sweden – has established its first company located in Kizuna 1 Serviced Factory Area called Backer Heating Factory. Backer Heating specializes in assembling and producing thermal equipment and heating equipment for automobiles.

To complete with the existing system in Kizuna Ready-built Factory, Reecons has been awarded by NIBE Group for the whole package of fit-out works including the necessary mechanical system for production line, electrical required inside the factory, fire fighting system with a guarantee of 1-year preventive maintenance to ensure 0% percent defects after handing over.

OTHER PROJECTS

OFH – Office Haus
Iron Mountain Warehouse
Jakob Factory Expansion
Hayat Kimya first production line in Vietnam
Anova Feedmill Factory
Detmold Packaging Vietnam Factory
Mapltree Logistic Park (Phase 4)
TW Pharmaceutical Factory 25 Project
Nidec Instruments
Aldo Shoes Retail Store

Trusted by international firms and partners 

Scroll to Top