Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
OFH – Office Haus - Reecons Engineering

PROJECT DETAIL

OFH – Office Haus

PROJECT OVERVIEW

Location: Celadon Tan Phu, Vietnam
Scale: Gamuda Land 22,000 sqm.
Client: Gamuda Land

DESCRIPTION

This high-end office building is certified by the U.S. Green Building Council (USGBC).

The building has a basement, 7 floors. The air conditioning system uses VRV air conditioning system. The fresh air supply system is designed in accordance with Ashrae standards and is supplied by 4 PAU (Frimary
Air Handling Units). The air processors with a heat recovery unit uses the exhaust air temperature to pre-cool the fresh air, then enters the PAU air processor and is blown into the working space on the floors. The building is equipped with solar roof top solar energy system with a capacity of 150KW serves the loads.

Being one of the most high-tech office building, all the M&E systems, elevators, parking, access control are managed and operated by the building management system (BMS).

OTHER PROJECTS

TW Pharmaceutical Factory 25 Project
AB Argi Vietnam Factory
Denis Canning Vietnam Factory
Cam Lam Golf Course
Mercedes-benz Tan Binh Showroom
Nidec Instruments
Universal Alloy Corporation Vietnam Factory
French Consultate General Ho Chi Minh City
Yau Hau Fook Restaurant
Anova Feedmill Factory

Trusted by international firms and partners 

Scroll to Top