Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
OFH – Office Haus - Reecons Engineering

PROJECT DETAIL

OFH – Office Haus

PROJECT OVERVIEW

Location: Celadon Tan Phu, Vietnam
Scale: Gamuda Land 22,000 sqm.
Client: Gamuda Land
Scope of Services: Full M&E and BMS Installation
Construction period: 5 months

DESCRIPTION

This high-end office building is certified by the U.S. Green Building Council (USGBC).

The building has a basement, 7 floors. The air conditioning system uses VRV air conditioning system. The fresh air supply system is designed in accordance with Ashrae standards and is supplied by 4 PAU (Frimary
Air Handling Units). The air processors with a heat recovery unit uses the exhaust air temperature to pre-cool the fresh air, then enters the PAU air processor and is blown into the working space on the floors. The building is equipped with solar roof top solar energy system with a capacity of 150KW serves the loads.

Being one of the most high-tech office building, all the M&E systems, elevators, parking, access control are managed and operated by the building management system (BMS).

OTHER PROJECTS

Rebisco Biscuit Vietnam Factory
OFH – Office Haus
USG Boral Factory (Phase 2)
Emivest Feedmill First Factory in Vietnam
Backer Heating Vietnam Factory
French Consultate General Ho Chi Minh City
Makino Technical Centre
XP Power Vietnam Factory (Phase 2)
Nestle Binh An Factory
La Tavola Restaurant

Trusted by international firms and partners 

Scroll to Top