Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Jakob Factory Expansion - Reecons Engineering

PROJECT DETAIL

Jakob Factory Expansion

PROJECT OVERVIEW

Location: VSIP II, Binh Duong, Vietnam
Scale: 1,269 sqm.
Client: Jakob Steel Rope System Vietnam
Scope of Services: Design & Build for Civil, MEP Installation and Solar Rooftop
Construction period: 3 months

DESCRIPTION

Founded in 1904, Jakob Rope Systems was originally a manufacturer of hemp rope for Swiss farmers. Now, they are presented in over 45 countries and offer an extensive line of products ranging from small-scale
sports netting to custom-made steel meshing used in grand architectural projects.

As a leader in sustainable and environmentally-friendly development, Jakob requires different conditions to guarantee the safety of construction work, the aesthetics, and consistency of the structure system, and very important to apply solar rooftop for the expansion factory to encourage green energy in manufacturing.

Reecons Construction was awarded both three package including Design & Build for Civil, MEP & Fire Fighting systems, and Solar Rooftop with a tight project schedule of 3 months to the completion.

OTHER PROJECTS

Iron Mountain Warehouse
Jakob Factory Expansion
Mercedes-benz Tan Binh Showroom
Vinagame Data Center
OFH – Office Haus
Levi's Retail Stores
Emivest Feedmill First Factory in Vietnam
Penthouses In City Garden
iLD Vietnam Coffee Plant
Riken Technos Vietnam Factory

Trusted by international firms and partners 

Scroll to Top