Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Jakob Factory Expansion - Reecons Engineering

PROJECT DETAIL

Jakob Factory Expansion

PROJECT OVERVIEW

Location: VSIP II, Binh Duong, Vietnam
Scale: 1,269 sqm.
Client: Jakob Steel Rope System Vietnam

DESCRIPTION

Founded in 1904, Jakob Rope Systems was originally a manufacturer of hemp rope for Swiss farmers. Now, they are presented in over 45 countries and offer an extensive line of products ranging from small-scale
sports netting to custom-made steel meshing used in grand architectural projects.

As a leader in sustainable and environmentally-friendly development, Jakob requires different conditions to guarantee the safety of construction work, the aesthetics, and consistency of the structure system, and very important to apply solar rooftop for the expansion factory to encourage green energy in manufacturing.

Reecons Construction was awarded both three package including Design & Build for Civil, MEP & Fire Fighting systems, and Solar Rooftop with a tight project schedule of 3 months to the completion.

OTHER PROJECTS

Universal Alloy Corporation Vietnam Factory
Iron Mountain Warehouse
Daikan Vietnam Factory
Mocal Creative Project
Backer Heating Vietnam Factory
Lam Ha Market
OFH – Office Haus
Hayat Kimya first production line in Vietnam
GREIF Flexible Vietnam Factory
Boe Electric Factory

Trusted by international firms and partners 

Scroll to Top