Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Makino Technical Centre - Reecons Engineering

PROJECT DETAIL

Makino Technical Centre

PROJECT OVERVIEW

Location: Saigon High-Tech Park, Vietnam, Vietnam
Scale: 10,400 sqm.
Client: Makino Vietnam Company Limited

DESCRIPTION

With its headquarters in Japan, Makino is a world leader in advanced CNC machining centers. The Makino Vietnam Technology Centre was built in Saigon Hi-Tech Park in HCMC. Reecons was awarded as the D&B Contactor for the MEP package, complying with the factory standardized requirements for the following installed systems: 1 sub-station 1600kVA, switchgear (DS, Re-closer, RMU), electrical system from MSB to DB distribution, LED lighting sources, pumping stations, Fire Protection system (Fire Alarm & Fire Fighting system), CCTV, ELV (Data & Telecom), plumbing and sanitary systems. All our systems operate stably on the base of our design.

OTHER PROJECTS

Backer Heating Vietnam Factory
Thuan Duc Brick Factory
Levi's Retail Stores
Mapltree Logistic Park (Phase 4)
Iron Mountain Warehouse
Vinmec International Hospital
Boustead Ready Built Factories (Phase 1)
Rals Processing Factory Project
BOSCH Vietnam Factory
Daikan Vietnam Factory