Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Marmon Fastening Solutions Fit-Out - Reecons Engineering

PROJECT DETAIL

Marmon Fastening Solutions Fit-Out

PROJECT OVERVIEW

Location: Ho Chi Minh, Vietnam
Scale: 8,000 sqm.
Client: Marmon Holdings, Inc

DESCRIPTION

Delivering Precision at Speed: A High-Standard Industrial Fit-Out

When Marmon Fastening Solution, a subsidiary of the global powerhouse Marmon Holdings, Inc., decided to establish its first manufacturing footprint in Vietnam, they required a partner capable of balancing extreme speed with technical rigor. Reecons was selected as the main contractor to deliver a comprehensive 8,000 sqm turnkey solution.

Comprehensive Scope of Works

To transform the shell into a high-performance production hub, Reecons managed a diverse array of specialized workstreams:

  • Civil & Interior Works: High-standard Epoxy flooring and architectural finishes tailored for industrial durability.

  • Full MEP Systems: Integrated mechanical, electrical, and plumbing infrastructure designed for stability.

  • Logistics Infrastructure: Installation of specialized racking systems and dock-levelers to optimize supply chain flow.

  • Machinery Installation: Precision setup of critical production equipment to meet Marmon’s global technical standards.

OTHER PROJECTS

French Consultate General Ho Chi Minh City
USG Boral Factory (Phase 2)
Nestle Binh An Factory
Jakob Factory Expansion
Vinagame Data Center
Anova Feedmill Factory
Vinmec International Hospital
Rebisco Biscuit Vietnam Factory
Detmold Packaging Vietnam Factory
TW Pharmaceutical Factory 25 Project

Trusted by international firms and partners 

Scroll to Top