Reecons was selected as the Design & Build contractor for fit-out works, including the MEP system for Detmold Packing’s first factory in VSIP-I.
Reecons delivered successfully within 3 months as required by the client, on the following systems: MSB, power cable, LED high-bay lightings, firefighting, wastewater treatment system, plumbing system, chilled water system to cool the printing machines and wax tanks with the heat control system.
When Detmold Packing expanded on three additional facilities in VSIP II, they confirm their trust in Reecons by awarding the Design & Build mission, and once again Reecons committed to delivering on time with a very tight schedule, high-quality requirements, and 100% safety hours to satisfy client’s expectations.