Reecons Engineering was appointed as the MEPF Design & Build contractor for the second-phase
renovation of Delta Galil’s garment manufacturing facility. The scope covered full design, supply,
and installation across electrical, mechanical, and plumbing systems — executed on an occupied facility
with active production operations on adjacent floors.
Key deliverables: Electrical distribution: panels, power cabling, LED lighting. ACMV: air conditioning,
ventilation, full ductwork and insulation. Compressed air piping throughout production areas.