Data Center of Sacombank was built and completed in 2008, in Binh Duong province. Data Center is designed and built to meet international standards of data center (TIA-942) - Tier 3 - concurrently maintainable at 99.982% vailability
The first Data Center of VNG Corporation at 20 Cong Hoa, HCMC was designed and built to meet international standards of Data Center (TIA-942) - Tier 3+ - concurrently maintainable with 99.982% Vailability.
La Tavola is a luxury Italian Restaurant with a concept of representing a place of enjoyment and nourishment for both body and spirit. Interior concept design brings modern and old materials into a new harmony, allowing the user to focus on the food served by the Italian chef.
Reecons was selected as General Contractor to provide the design & construction package for the entire M&E fit-out works for the Chinese restaurant located on the 5th floor of Thuan Kieu plaza.
City Garden has been recognized as one of the most high-end residential project in Ho Chi Minh city located in Binh Thanh district. By working with DFA Vietnam, Reecons was choosen to complete 4 penthouses No. 3004-B1(L), 3002-B1(S), 2701-B2(M), and 3003.
The entire fit-out works cover power supply connection to the stores taken from the main power supply of the building, lighting system, socket outlet, ELV system including data, telephone, speaker, fire alarm and air conditioning system with air ducts, return & supply air grill.
Following the development plan of Levi’s stores for Vietnam market, Reecons was appointed as MEP contractor for their MEP system audit and refurbishment. We implemented our fit-out works for their 6 stores located all around Ho Chi Minh city.
With the understanding of the vision and design style of FutureWorld, coming with high requirements for the aesthetic, Reecons conducted the fit-out works for the entire power supply, functional and decorative lighting, socket outlet for electronic devices, air grill integrated with flexible air ducts connection and firefighting relocation with high quality.
Aldo's luxury retail store is located in the Saigon Center and included a variety of decorative lighting inside the box and cabinets, has been well installed by Reecons' workmanship and technical team.
Being one of the most high-tech office building, all the M&E systems, elevators, parking, access control are managed and operated by the building management system (BMS).
Villa project combined with high-end office, interior and M&E package with high standards of equipment and installation. Supervision consultant worked and coordinated very closely with professional consultants on interior and M&E system.
Japanese factory project with the following installed MEP systems: 1600 kVA transformer station, HV panel, LV & ELV including data, telephone, camera and access control system, HVAC system and Firefighting system.
Reecons Engineering was selected as the main contractor to design and build the fitout package with the most advanced technology for the production of packaged animal feed for exporting, according to the
strictstandards of the European investor.
Jakob, a leader in sustainable development, sought a partner to ensure the safety, aesthetics, and structural integrity of their factory expansion. Reecons Construction was awarded a comprehensive contract, including Design & Build for Civil, MEP & Fire Fighting systems, and Solar Rooftop installation. With a tight 3-month schedule, Reecons is committed to delivering a sustainable, efficient, and visually appealing facility.
With the evaluation from SEAS Consultant and the trust from iLD Vietnam Co., Ltd., Reecons has been awarded the Fire Fighting package for the whole factory land area.
In 2022, with the demand of renovation of the old factory, OnSemiconductor Vietnam has decided to award
the package of installation a new MSB and transformer room to Reecons with the instruction of no
interruption to the operation activities.
Iron Mountain, a leading record management and storage company, has numerous storage facilities spread across various cities in Asia. Iron Mountain decides to lease a new warehouse in HCM City, Vietnam for their business growth.
USG Boral started operations in Vietnam in 2005 and is the first foreign company with plasterboard manufacturing facilities in Vietnam. Located in Hiep Phuoc Industrial Zone, USG Boral’s factory supplies an extensive selection of building materials to various target audiences in Vietnam.
Hayat Kimya is one of the world leaders in baby diapers, home care products, sanitary napkins. For their development in South East Asia, Hayat Kimya chose Vietnam as the location of their first production site and selected Reecons Engineering for the full MEP installation over big names in this industry.
Universal Alloy Corporation developed their first facility for aerospace components in Da Nang. Reecons was selected as Design & Build contractor for the MEP package of the project, complying with the combined safety requirements of the general contractor Dinco and the UAC Investor.