Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Mapltree Logistic Park (Phase 4) - Reecons Engineering

PROJECT DETAIL

Mapltree Logistic Park (Phase 4)

PROJECT OVERVIEW

Location: VSIP II Binh Duong, Vietnam
Scale: 58,800 sqm.
Client: Mapletree Vietnam Management Consultancy Co., Ltd.

DESCRIPTION

Reecons installed M&E systems such as main power, lightning protection, CCTV and water supply, plumping systems to meet the high standard requirement of the Client such as NFPA and UL/FM, all by respecting the aesthetic aspect of the project.

As a result, Reecons claims a complete success on this project with:

  • 120,000 safe hours
  • Catch up on schedule, more than 1 month in advance
  • High technical and aesthetics standards, approved by the client.

OTHER PROJECTS

Nidec Instruments
AB Argi Vietnam Factory
Iron Mountain Warehouse
Bac Lieu Power Company
Backer Heating Vietnam Factory
Future World Retail Store
Private Luxury Villa
Levi's Retail Stores
Marmon Fastening Solutions Fit-Out
Mapltree Logistic Park (Phase 4)

Trusted by international firms and partners 

Scroll to Top