Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: array_keys() expects parameter 1 to be array, null given in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26

Warning: Invalid argument supplied for foreach() in /var/www/vhosts/reecons.vn/httpdocs/wp-content/plugins/navz-photo-gallery/includes/acf_photo_gallery.php on line 26
Mapltree Logistic Park (Phase 4) - Reecons Engineering

PROJECT DETAIL

Mapltree Logistic Park (Phase 4)

PROJECT OVERVIEW

Location: VSIP II Binh Duong, Vietnam
Scale: 58,800 sqm.
Client: Mapletree Vietnam Management Consultancy Co., Ltd.
Scope of Services: Full MEP Installation
Construction period: 06 months

DESCRIPTION

Reecons installed M&E systems such as main power, lightning protection, CCTV and water supply, plumping systems to meet the high standard requirement of the Client such as NFPA and UL/FM, all by respecting the aesthetic aspect of the project.

As a result, Reecons claims a complete success on this project with:

  • 120,000 safe hours
  • Catch up on schedule, more than 1 month in advance
  • High technical and aesthetics standards, approved by the client.

OTHER PROJECTS

Aldo Shoes Retail Store
Detmold Packaging Vietnam Factory
Vinagame Data Center
Levi's Retail Stores
Satra Eximland Building
Onsemi Factory Renovation
Nestle Binh An Factory
Jakob Factory Expansion
Backer Heating Vietnam Factory
Universal Alloy Corporation Vietnam Factory

Trusted by international firms and partners 

Scroll to Top